Larry Sullivan wrote:Well Larry you did a heck of a job yesterday, so I figured I'd try to help out today. I'm supposed to be doing work around the house -- but yeah it can wait!
Larry Sullivan wrote:As I'm sitting here in 86 degree weather, that snow shot is really calling! (Though nice cool front coming through tonight).
FYI - your shot is flipped sideways, but looks fantastic.
I've got to be out a couple hours in the morning tomorrow, but will be here much of the day -- will gladly post what I can throughout the day!
Rich Murray wrote:For what it's worth, 216 more days
Larry Sullivan wrote:Rich Murray wrote:For what it's worth, 216 more days
The countdown has begun!!
Rich Murray wrote:We had one last year. It don't pay to mess with tradition :)
Rich Murray wrote:You question faster than I can edit. ;)
Jason Rose wrote:Rich Murray wrote:You question faster than I can edit. ;)
Sorry. I don't remember the 463 countdown either.
But, I'll put one up. I assume Opening Day will be Saturday, May 24.
Gary Kimble wrote:Wow guys this is awesome. Will there be any special runs? I saw a video of the train running in the snow a while ago.
Also, you refer to the swamp and I assume that is to the east of the engine house. How many tracks are there?
Thanks for all the pictures and video Larry. I can't take me eyes off this site.
Allan Kirkpatrick wrote:Larry,
Thanks for the close up of the Derrick.
The Pile Driver has a vertical rectangular frame attached to a swivel base that allows it to swing side to side and to angle as well.
The hammer rides within the rectangular frame to drive the piles into the ground.
The vertical frame can be lowered so it can be transported.
Come to think of it, isn't the pile driver up in Antonito?
Users browsing this forum: No registered users and 58 guests