About 10:40 this morning, 463 pulled a cold locomotive from the shop, up to about the first switch. Front end loader then brought 3 loads of coal over for the tender, then 463 pushed the locomotive back to outside the shop doors. My first thought was this was 489, however with the loading of coal could this be 487 out for the first time this season?
Whole process took about 20 minutes, first video is the sped up version for those without time for the full version. 2nd video is the full approx 20 minutes of the move.

