Photos on work done to rider gon 1204

Discussion Pertaining to Work Session F - 2019

Photos on work done to rider gon 1204

Unread postby Sharon Evans » Sat Sep 14, 2019 8:29 am

Pat Maufrais sent me additional photos of the work done on 1204 throughout session F, so I am putting all of them here even though they encompass the entire week.
2019.08.05 The work crew doing the rebuild on 1204 (1 of 1).jpg
2019.08.05 The work crew doing the rebuild on 1204 (1 of 1).jpg (116.23 KiB) Viewed 1239 times

2019.08.05 Working on the brake cylinder under 1204 (1 of 1).jpg
2019.08.05 Working on the brake cylinder under 1204 (1 of 1).jpg (95.01 KiB) Viewed 1239 times

2019.08.05 using all they have to remove the mounting plate from the cylinder (1 of 1).jpg
2019.08.05 using all they have to remove the mounting plate from the cylinder (1 of 1).jpg (100.35 KiB) Viewed 1239 times

2019.08.05 Applying primer to the boards to be installed on 1204 (1 of 1).jpg
2019.08.05 Applying primer to the boards to be installed on 1204 (1 of 1).jpg (116.24 KiB) Viewed 1239 times

2019.08.05 Clamping the lower side board onto 1204 (1 of 1).jpg
2019.08.05 Clamping the lower side board onto 1204 (1 of 1).jpg (89.5 KiB) Viewed 1239 times

2019.08.05 Looks like they are installing the u bracket onto one of the uprights (1 of 1).jpg
2019.08.05 Looks like they are installing the u bracket onto one of the uprights (1 of 1).jpg (90.84 KiB) Viewed 1239 times

2019.08.05 Installing the bolts to hold the side board to the uprights (1 of 1).jpg
2019.08.05 Installing the bolts to hold the side board to the uprights (1 of 1).jpg (100.98 KiB) Viewed 1239 times

2019.08.05 The team is getting the side board attached (1 of 1).jpg
2019.08.05 The team is getting the side board attached (1 of 1).jpg (90.71 KiB) Viewed 1238 times

2019.08.05 Getting the brace into its proper location (1 of 1).jpg
2019.08.05 Getting the brace into its proper location (1 of 1).jpg (85.26 KiB) Viewed 1238 times

2019.08.05 Getting the second side board mounted (1 of 1).jpg
2019.08.05 Getting the second side board mounted (1 of 1).jpg (93.24 KiB) Viewed 1238 times

2019.08.05 Trimming a side board to length (1 of 1).jpg
2019.08.05 Trimming a side board to length (1 of 1).jpg (91.02 KiB) Viewed 1238 times

2019.08.05 Blue painters tape makes a great guide to drill (1 of 1).jpg
2019.08.05 Blue painters tape makes a great guide to drill (1 of 1).jpg (63.62 KiB) Viewed 1238 times

2019.08.05 Side braces installed and the tools used to get this done (1 of 1).jpg
2019.08.05 Side braces installed and the tools used to get this done (1 of 1).jpg (82.81 KiB) Viewed 1238 times

2019.08.05 Getting the mounting bolts installed on the side boards (1 of 1).jpg
2019.08.05 Getting the mounting bolts installed on the side boards (1 of 1).jpg (61.82 KiB) Viewed 1238 times

2019.08.05 Reinstalling the brake cylinder on 1204 (1 of 1).jpg
2019.08.05 Reinstalling the brake cylinder on 1204 (1 of 1).jpg (85.59 KiB) Viewed 1238 times

2019.08.05 This is the test rig used for the air brakes (1 of 1).jpg
2019.08.05 This is the test rig used for the air brakes (1 of 1).jpg (100.43 KiB) Viewed 1238 times

2019.08.05 Looking down the length of the 1204 with the sides now installed (1 of 1).jpg
2019.08.05 Looking down the length of the 1204 with the sides now installed (1 of 1).jpg (79.5 KiB) Viewed 1238 times

2019.08.05 Shot down the length of 1204 from the opposite end (1 of 1).jpg
2019.08.05 Shot down the length of 1204 from the opposite end (1 of 1).jpg (83.22 KiB) Viewed 1238 times

2019.08.05 Side view of the 1204 (1 of 1).jpg
2019.08.05 Side view of the 1204 (1 of 1).jpg (89.3 KiB) Viewed 1238 times

2019.08.05 Primer has been applied to the 1204 (1 of 1).jpg
2019.08.05 Primer has been applied to the 1204 (1 of 1).jpg (73.81 KiB) Viewed 1238 times




.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Return to Work Session F (Aug 5-9)

Who is online

Users browsing this forum: No registered users and 3 guests