RR Sidings?

Get the latest news here. Forum Instructions/Tips are also here.

RR Sidings?

Unread postby Craig Kumler » Mon May 02, 2016 2:25 pm

Is the RR building a new pair of sidings in Antonito? Any info or pics!
Craig Kumler
Engineer
Engineer
 
Posts: 394
Joined: Mon Nov 28, 2011 4:24 pm
Location: San Jose, Ca.

Re: RR Sidings?

Unread postby Doug Frederick » Mon May 02, 2016 8:32 pm

They seem to be. There's a lot of rail and ties (spiked) across the 285 grade crossing. I heard it was for general storage, but I dunno.

https://www.facebook.com/photo.php?fbid ... =3&theater

Photos by Jay Wimer.
"The Beatings Will Continue Until Morale Improves..."

https://picasaweb.google.com/110183472086414135127
User avatar
Doug Frederick
Engineer
Engineer
 
Posts: 211
Joined: Tue Jun 18, 2013 6:06 am
Location: Chama, NM, as of 1 Jan 2015.

Re: RR Sidings?

Unread postby Tom Casper » Tue May 03, 2016 8:46 am

some pics on facebook

Tom C.
Later:
tom at srclry dot com
A student of the Southend RGS!
Tom Casper
Conductor
Conductor
 
Posts: 819
Joined: Wed Jan 25, 2012 3:25 pm
Location: Southwest of the Windy City

Re: RR Sidings?

Unread postby John Hamman » Tue May 03, 2016 2:37 pm

Very interesting pictures. Maybe somebody can better orient me though. It looks like the long stretch of new track is on the NW side of the line - toward rt 17. However, the switch in the picture looks like it turns out to the opposite side - toward Co Rd 12.5. Any ideas about where and for how far the siding will run? How about that - laying new narrow guage track.
John
John Hamman
Engineer
Engineer
 
Posts: 373
Joined: Wed Aug 21, 2013 12:50 pm

Re: RR Sidings?

Unread postby Steve Forney » Fri May 06, 2016 8:07 am

John Matthews told me that Antonito does not have enough car storage tracks. In the winter, too much complicated switching is required to move cars in and out of the shop for work.

2 tracks (I believe) are being built just west of the US285 crossing. I don't know if they are connected to the main at both ends or not. The west end is before the first road crossing west of US285, at the Highway Dept yard. Tracks are on the north side of the main. Rail looked to be heavy.
Steve Forney
Steve Forney
Fireman
Fireman
 
Posts: 158
Joined: Mon Nov 28, 2011 8:07 pm

Re: RR Sidings?

Unread postby Jason Rose » Fri May 06, 2016 8:09 am

Thank you, Mr. Forney.
Jason Rose
<><
Ferroequinearcheologist-in-Training
RioGrandeExplorations.net
Spring, Texas - MP 209.7 - UP Palestine Sub
"All that is necessary for the triumph of evil is that good men do nothing"
"The price of freedom is eternal vigilance" - Wendell Phillips
"Life is tough, but it's tougher when you're stupid." - Sgt Stryker USMC
“Life is too short to deal with other people’s drama.” – Sgt Jason Rose USMC
User avatar
Jason Rose
Moderator
Moderator
 
Posts: 2799
Joined: Thu Nov 17, 2011 1:09 pm
Location: Spring, Texas (MP 209.7 - UP Palestine Sub)

Re: RR Sidings?

Unread postby John Hamman » Sat May 07, 2016 7:51 pm

Steve Forney wrote:John Matthews told me that Antonito does not have enough car storage tracks. In the winter, too much complicated switching is required to move cars in and out of the shop for work.

2 tracks (I believe) are being built just west of the US285 crossing. I don't know if they are connected to the main at both ends or not. The west end is before the first road crossing west of US285, at the Highway Dept yard. Tracks are on the north side of the main. Rail looked to be heavy.


Thanks very much for the additional info. Cannot wait to see it!
John
John Hamman
Engineer
Engineer
 
Posts: 373
Joined: Wed Aug 21, 2013 12:50 pm

Re: RR Sidings?

Unread postby Tim Tennant » Wed Jun 01, 2016 9:23 am

I believe that John wants to use the siding for loading ballast as well. The biggest factor is as observed the lack of track space in Antonito.
User avatar
Tim Tennant
Engineer
Engineer
 
Posts: 434
Joined: Mon Nov 21, 2011 4:04 pm

Re: RR Sidings?

Unread postby Craig Kumler » Thu Jun 23, 2016 1:30 pm

Tim: Are the sidings done and connected to the main yet?
Craig Kumler
Engineer
Engineer
 
Posts: 394
Joined: Mon Nov 28, 2011 4:24 pm
Location: San Jose, Ca.

Re: RR Sidings?

Unread postby Doug Frederick » Thu Jun 23, 2016 9:51 pm

Not as of this week.
"The Beatings Will Continue Until Morale Improves..."

https://picasaweb.google.com/110183472086414135127
User avatar
Doug Frederick
Engineer
Engineer
 
Posts: 211
Joined: Tue Jun 18, 2013 6:06 am
Location: Chama, NM, as of 1 Jan 2015.

Re: RR Sidings?

Unread postby Paul Davenport » Fri Jun 24, 2016 3:54 am

From a few observations of the track crew's movements and positioning of some equipment, it looked like MOW activity this week is elsewhere along the line -- out near Los Pinos and Osier. Maybe the siding project will wait for a while. From what has been said in this string, maybe there's no need to finish it until before the winter.
Paul Davenport
Engineer
Engineer
 
Posts: 273
Joined: Mon Nov 28, 2011 9:42 pm
Location: Phoenix, AZ


Return to NEWS & Updates

Who is online

Users browsing this forum: No registered users and 2 guests