Stair Construction Car 0252/470 Continued

Discussions regarding past and current projects of the Friends - Colorado Springs Detachment

Stair Construction Car 0252/470 Continued

Unread postby John Engs » Sun Apr 10, 2016 10:18 pm

This is a continuation from the first posting on Stair Construction Car 0252/470.
IMG_1643.JPG
Finally the assembly starts with steps fitted to the rails and glued, the 5/16” threaded rods are inserted and washer with nut attached to each rod end; the toe boards are fitted, glued and slide into place. The final step is securing the nuts on the rods to tighten the assembly.
IMG_1643.JPG (110.09 KiB) Viewed 5047 times
IMG_1645.JPG
Looking at the underside of the bottom step you see the two support rods traverse the lower step securing the step between the risers.
IMG_1645.JPG (104.97 KiB) Viewed 5047 times
IMG_1644.JPG
From the side view you can see the support rods as they terminate to the outside of the riser. Note the rounded nose on each step.
IMG_1644.JPG (126.24 KiB) Viewed 5047 times
IMG_1646.JPG
This shows the underside of the staircase and the two rods that support each step.
IMG_1646.JPG (118.36 KiB) Viewed 5047 times
John Engs
Brakeman
Brakeman
 
Posts: 12
Joined: Sat Dec 03, 2011 12:46 pm

Return to Colorado Springs Detachment

Who is online

Users browsing this forum: No registered users and 4 guests