Wednesday, 11-13

Tell us what interesting thing you saw on the web-cams.

Wednesday, 11-13

Unread postby Edwin Frey » Wed Nov 13, 2013 7:04 am

From the looks of the smoke pouring out of the engine house stack, I think we can expect to see #484 out and about again today. Joe K has posted some interesting information over on the NGDF. Check it out. :smiley16:
Mr. Ed
Avid fan of the C&TSRR, garden railroader, general gofer.
Definitely narrow (gauge) minded.
User avatar
Edwin Frey
Engineer
Engineer
 
Posts: 350
Joined: Thu May 02, 2013 9:51 am
Location: Loveland, CO

Re: Wednesday, 11-13

Unread postby Joe Kanocz » Wed Nov 13, 2013 7:53 am

Here's the same info. The railroad posted on Facebook that 484 will be going to Antonito during the off season. 484 will be undergoing testing and test runs to from Chama. Once it's done, there will be a run over the line to Antonito. And 484 will then spend the winter in Antonito. The next day 489 will be coming to Chama for the winter.

The only equipment in Chama right now is Friends maintained non-revenue equipment. In another words there are no red coaches. The railroad is willing to take anyone paying on this run. I haven't heard a ticket price or the exact date of the runs.

However this is a unique time. There could or could not be snow. 484 does have a plow on it. The consist could simply be 579. However if something logical is proposed, I think it would be considered.

Anyone going on this run as a paying passenger would experience something much different than during the normal season. I don't think there have been any runs over the line in December or late Nov in a long time. And any revenue at this time of year is a bonus.
Joe Kanocz
Moderator
Moderator
 
Posts: 580
Joined: Thu Nov 17, 2011 5:06 pm

Re: Wednesday, 11-13

Unread postby Larry Sullivan » Wed Nov 13, 2013 9:45 am

484 now outside of the engine house. Came out to about the switch, then backed up to the door again.
Attachments
bandicam 2013-11-13 11-44-06-659.jpg
484 Movement 11-13-13
bandicam 2013-11-13 11-44-06-659.jpg (109.13 KiB) Viewed 2796 times
bandicam 2013-11-13 11-46-25-023.jpg
484 Movement 11-13-13
bandicam 2013-11-13 11-46-25-023.jpg (110.9 KiB) Viewed 2793 times
Last edited by Larry Sullivan on Wed Nov 13, 2013 10:21 am, edited 1 time in total.
Larry Sullivan
Conductor
Conductor
 
Posts: 3297
Joined: Sat Jun 01, 2013 12:28 am
Location: Dunnellon, Florida

Re: Wednesday, 11-13

Unread postby Larry Sullivan » Wed Nov 13, 2013 10:02 am

Quick video of the first move - they've done it 3 times now. As a reminder for those not following before, just click the picture it will take you to the video.

Image

3rd trip out and back, no real difference than 1st video, but a bit better smoke show. Obviously testing/adjusting as needed.

Image
Larry Sullivan
Conductor
Conductor
 
Posts: 3297
Joined: Sat Jun 01, 2013 12:28 am
Location: Dunnellon, Florida

Re: Wednesday, 11-13

Unread postby Larry Sullivan » Wed Nov 13, 2013 10:33 am

Just a quick observation that one of the speeders has left the yard - perhaps to check the track prior to 484 doing a test run?
Larry Sullivan
Conductor
Conductor
 
Posts: 3297
Joined: Sat Jun 01, 2013 12:28 am
Location: Dunnellon, Florida

Re: Wednesday, 11-13

Unread postby Larry Sullivan » Wed Nov 13, 2013 12:01 pm

I wasn't here for a bit, but by the smoke it appears 484 is now back inside the engine house. Seemed they were working in the left front area of the locomotive while it was outside, not sure if it's just the lighting or if it's a large amount of water on the ground where they were sitting. Hopefully nothing more than a grumpy locomotive after waking up from it's long nap.

484 back outside again at 1:30 Chama time.
Larry Sullivan
Conductor
Conductor
 
Posts: 3297
Joined: Sat Jun 01, 2013 12:28 am
Location: Dunnellon, Florida


Return to Web Cameras

Who is online

Users browsing this forum: No registered users and 22 guests