Progress continues on the RPO. The wall that divides the mail and baggage/freight area is done. The frieght/baggage compartment is done other than final paint/finishing.
On the mail side, a wall for the bathroom/toilet is being installed. Guess where the toilet drained?????
Up on the snow shed, the final touches were done. Not only was a massive beam replaced, but a lot of metal flashing was installed to protect the other wood.
The snow shed with a moon roof. All of these boards were removed to install metal flashing for water/moisture protection.