Cumbres progress week 2

Cumbres progress week 2

Unread postby Sharon Evans » Wed Jul 08, 2020 10:17 am

Tom Simco has forwarded me pictures for this week.
Interior walls of the Car Inspectors House showing bracing and lumber.jpg
Interior walls of the Car Inspectors House showing bracing and lumber

Another inside shot showing a table saw as well as bracing for the new walls.jpg
Another inside shot showing a table saw as well as bracing for the new walls

Looking back along the walkway being used to access the framing.jpg
Looking back along the walkway being used to access the framing

Looking down through the framing joists.jpg
Looking down through the framing joists.jpg (283.47 KiB) Viewed 3370 times

Looking down at the framing for the second floor as it goes in.jpg
Looking down at the framing for the second floor as it goes in




.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: Cumbres progress week 2

Unread postby Sharon Evans » Sat Jul 11, 2020 11:10 am

More shots from Tom Simco and John Cole.
Another angle of the walk boards and equipment.jpg
Another angle of the walk boards and equipment

Another shot of the joists that form the second floor.jpg
Another shot of the joists that form the second floor.jpg (51.88 KiB) Viewed 2993 times

Looking at some of the boards over the second floor joists.jpg
Looking at some of the boards over the second floor joists.jpg (51.1 KiB) Viewed 2993 times

Looking down through the joists to the main floor.jpg
Looking down through the joists to the main floor

The flooring is being attached to the joists.jpg
The flooring is being attached to the joists.jpg (44.41 KiB) Viewed 2993 times

.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: Cumbres progress week 2

Unread postby Sharon Evans » Fri Jul 17, 2020 12:20 pm

Pictures sent to me today, 07/17/2020, by John Cole.
The floor to the second story takes shape with the section house in the background.jpg
The floor to the second story takes shape with the section house in the background

Working on the second floor flooring.jpg
Working on the second floor flooring

Looking over the flooring toward the Cumbres parking lot with a group of avts parked there.jpg
Looking over the flooring toward the Cumbres parking lot with a group of atvs parked there


.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: Cumbres progress week 2

Unread postby Tom Casper » Mon Jul 27, 2020 6:34 pm

Boy are these in the wrong area of the site!

Tom C.
Later:
tom at srclry dot com
A student of the Southend RGS!
Tom Casper
Conductor
Conductor
 
Posts: 819
Joined: Wed Jan 25, 2012 3:25 pm
Location: Southwest of the Windy City

Re: Cumbres progress week 2

Unread postby Jason Rose » Tue Jul 28, 2020 8:24 am

Tom Casper wrote:Boy are these in the wrong area of the site!

Tom C.


My fault, Tom. It's fixed now.
Jason Rose
<><
Ferroequinearcheologist-in-Training
RioGrandeExplorations.net
Spring, Texas - MP 209.7 - UP Palestine Sub
"All that is necessary for the triumph of evil is that good men do nothing"
"The price of freedom is eternal vigilance" - Wendell Phillips
"Life is tough, but it's tougher when you're stupid." - Sgt Stryker USMC
“Life is too short to deal with other people’s drama.” – Sgt Jason Rose USMC
User avatar
Jason Rose
Moderator
Moderator
 
Posts: 2799
Joined: Thu Nov 17, 2011 1:09 pm
Location: Spring, Texas (MP 209.7 - UP Palestine Sub)

Re: Cumbres progress week 2

Unread postby Tom Casper » Tue Jul 28, 2020 5:54 pm

I knew u would handle it after I posted it.

Tom C.
Later:
tom at srclry dot com
A student of the Southend RGS!
Tom Casper
Conductor
Conductor
 
Posts: 819
Joined: Wed Jan 25, 2012 3:25 pm
Location: Southwest of the Windy City


Return to All 2020 Work Sessions Combined

Who is online

Users browsing this forum: No registered users and 8 guests