2020 session Cumbres Pass Car Inspectors House work

2020 session Cumbres Pass Car Inspectors House work

Unread postby Sharon Evans » Sat Jun 27, 2020 10:29 am

A crew came together to continue the work that has been ongoing for several years to repair and rebuild the Car Inspectors house at Cumbres Pass. Last year is was noted during this work at the foundation was in very poor shape and needed to be completely redone. So this year the crew began by doing this. All 4 walls were removed intact to enable quick reassembly and work on the foundation began.
A big thanks and credit for these photographs goes to Tom Simco who sent them to me for this posting.
It should the noted as you look at these pictures that the crew maintain social distancing as best they could under the trying circumstances which includes doing strenuous work at 10,000 feet. There were times when distancing was not able to be maintained but these were held to a bare minimum.
1 Close up of the crew.jpg
Close up of the crew

2 Work progresses on the new footings of the CIH.jpg
Work progresses on the new footings of the CIH

3 Looking at thow the drain field is being prepared using stones and gravel.jpg
Looking at how the drain field is being prepared using stones and gravel
3 Looking at thow the drain field is being prepared using stones and gravel.jpg (291.57 KiB) Viewed 3356 times

4 Looking at the outside of the foundation showing both the insulation and drain pipe.jpg
Looking at the outside of the foundation showing both the insulation and drain pipe
4 Looking at the outside of the foundation showing both the insulation and drain pipe.jpg (174.73 KiB) Viewed 3356 times

5 Looking at the sides of the footings with the insulation and drain pipe.jpg
Looking at the sides of the footings with the insulation and drain pipe
5 Looking at the sides of the footings with the insulation and drain pipe.jpg (314.29 KiB) Viewed 3356 times

6 Looking at how the drain pipe is set into the drain field away from the building.jpg
Looking at how the drain pipe is set into the drain field away from the building
6 Looking at how the drain pipe is set into the drain field away from the building.jpg (337.38 KiB) Viewed 3356 times

7 Showing the insulation being attached to the side of the footing.jpg
Showing the insulation being attached to the side of the footing
7 Showing the insulation being attached to the side of the footing.jpg (303.07 KiB) Viewed 3356 times

8 Pouring concrete at the fireplace area.jpg
Pouring concrete at the fireplace area
8 Pouring concrete at the fireplace area.jpg (182.5 KiB) Viewed 3356 times

9 Long shot looking at the footings set and backfilled.jpg
Long shot looking at the footings set and backfilled
9 Long shot looking at the footings set and backfilled.jpg (293.82 KiB) Viewed 3356 times

10 Crew working on the fench around the house.jpg
Crew working on the fench around the house
10 Crew working on the fench around the house.jpg (308.59 KiB) Viewed 3356 times

12 The framing supports are being attached to the top of the footings.jpg
The framing supports are being attached to the top of the footings
12 The framing supports are being attached to the top of the footings.jpg (246.46 KiB) Viewed 3356 times

13 The crew continues to build the new footings for the house.jpg
The crew continues to build the new footings for the house
13 The crew continues to build the new footings for the house.jpg (227.17 KiB) Viewed 3356 times

11 Working begins in installing the flooring in the house.jpg
Working begins in installing the flooring in the house
11 Working begins in installing the flooring in the house.jpg (241.1 KiB) Viewed 3356 times







.
Last edited by Sharon Evans on Sat Jun 27, 2020 11:59 am, edited 1 time in total.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: 2020 session Cumbres Pass Car Inspectors House work

Unread postby Sharon Evans » Sat Jun 27, 2020 10:59 am

Pictures continued:
14 The crew works on the main floor with the subfloor seen below.jpg
The crew works on the main floor with the subfloor seen below

15 A shot of the framing for the floor and some of the floor itself laid out.jpg
A shot of the framing for the floor and some of the floor itself laid out

17 Nailing is being done.jpg
Nailing is being done

18 One of the crew seems happy with the work being done so far..jpg
One of the crew seems happy with the work being done so far.

19 The crew works on getting the house back to shape.jpg
19 The crew works on getting the house back to shape.jpg (362.98 KiB) Viewed 3353 times

20 Another angle of the work on the second wall.jpg
20 Another angle of the work on the second wall.jpg (239.67 KiB) Viewed 3353 times

21 Walls are going back up with the second in place.jpg
21 Walls are going back up with the second in place.jpg (449.77 KiB) Viewed 3353 times

24 The third wall is up and braced.jpg
The third wall is up and braced

25 Looking over the boom on the loader at the work.jpg
25 Looking over the boom on the loader at the work.jpg (172.7 KiB) Viewed 3353 times

26 The part of forth wall is now in place.jpg
26 The part of forth wall is now in place.jpg (195.61 KiB) Viewed 3353 times

27 The final section of the wall is being lifted into place.jpg
27 The final section of the wall is being lifted into place.jpg (153.82 KiB) Viewed 3353 times

28 The walls of the first floor are now all placed and being secured.jpg
28 The walls of the first floor are now all placed and being secured.jpg (188.09 KiB) Viewed 3353 times




.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: 2020 session Cumbres Pass Car Inspectors House work

Unread postby Craig Kumler » Sat Jun 27, 2020 3:19 pm

Great work by the Cumbres crew! Thanks for the pics.
Craig Kumler
Engineer
Engineer
 
Posts: 394
Joined: Mon Nov 28, 2011 4:24 pm
Location: San Jose, Ca.

Re: 2020 session Cumbres Pass Car Inspectors House work

Unread postby Pete Dahlberg » Sun Jun 28, 2020 1:11 pm

The pictures showing the foundation work were from the tail end of the 2019 season. The crew picture was from the week of 6-15-20
Pete Dahlberg
Engineer
Engineer
 
Posts: 479
Joined: Tue Aug 18, 2015 1:53 pm
Location: Arlington TX

Re: 2020 session Cumbres Pass Car Inspectors House work

Unread postby Sharon Evans » Mon Jun 29, 2020 9:06 am

John Cole forwarded me a new group of shots for the Car Inspectors House and will post those here in, what I hope, is the right order.
A close shot of how the drain pipe fit into the drain field.jpg
A close shot of how the drain pipe enters the drain field

The foundation is being backfilled after the work was done on insulation and drainage.jpg
The foundation is now being backfilled

Working on the dirt around the foundation of the house.jpg
Smoothing out the backfill

We see both of the side walls laying down on the floor prior to raising.jpg
WE can see both of the side walls lying on the floor prior to being raised back into place

Crrew working on one of the walls getting it ready to put back into place.jpg
The crew is working on one of the wall getting it ready to raise

One of the walls has been erected and the bracing is being put in place.jpg
One of the walls has been erected and is now being braced

Working on the framing of the CIH.jpg
Working on the framing of the house

Attaching the outside sheathing to the CIH.jpg
Attaching the outside sheathing to a wall

Working on framing in the door to the house.jpg
Framing in the front door to the house


.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: 2020 session Cumbres Pass Car Inspectors House work

Unread postby Sharon Evans » Wed Jul 01, 2020 9:32 am

Tom Simco has sent me additional photos and here is the first one. The other 3 are in a format which I am unable to save onto my computer so I can process them.
The interior walls are being put back up.jpg
The interior walls are being put back up.jpg (230.72 KiB) Viewed 2693 times
.
The exterior from a different angle.jpg
The exterior from a different angle.jpg (128.82 KiB) Viewed 2640 times

Working being done on an inside wall.jpg
Working being done on an inside wall.jpg (128.19 KiB) Viewed 2640 times

.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: 2020 session Cumbres Pass Car Inspectors House work

Unread postby Sharon Evans » Tue Jul 07, 2020 2:08 pm

Roger has posted a drone video of the car inspectors house. Must have been within the last day or so.

viewtopic.php?f=116&t=7165
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA


Return to All 2020 Work Sessions Combined

Who is online

Users browsing this forum: No registered users and 6 guests