2019-06-19 Wednesday day 3 session C

Discussion Pertaining to Work Session E - 2019

2019-06-19 Wednesday day 3 session C

Unread postby Sharon Evans » Sat Jun 01, 2019 1:35 pm

Currently, as of 1500 local EDT 6/20/19, there are no images posted for me to work on.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: 2019-06-19 Wednesday day 3 session C

Unread postby William Hoss » Thu Jun 20, 2019 2:48 pm

Shame, that seems to have been the trend over the last few sessions. I really look forward to seeing what's going on in Chama, Antonito and Lava Pump House.
William Hoss
Brakeman
Brakeman
 
Posts: 2
Joined: Fri Jul 28, 2017 10:49 am

Re: 2019-06-19 Wednesday day 3 session C

Unread postby John Cole » Thu Jun 20, 2019 6:49 pm

Chris James tells me there was a major internet outage with one of the ISP's in Northern New Mexico which might have something to do with it. The other problem is that the internet is not working in the building that the Friends use to upload photos of work being done. Hopefully this will be resolved soon.
John Cole
Conductor
Conductor
 
Posts: 729
Joined: Mon Nov 28, 2011 12:55 pm

Re: 2019-06-19 Wednesday day 3 session C

Unread postby Sharon Evans » Fri Jun 21, 2019 12:36 pm

Problems fixed and I have both Wednesday and Thursday in hand and will process them before the day is over.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: 2019-06-19 Wednesday day 3 session C

Unread postby William Hoss » Fri Jun 21, 2019 1:29 pm

Thanks for the update Sharon. Looking forward to seeing them.
William Hoss
Brakeman
Brakeman
 
Posts: 2
Joined: Fri Jul 28, 2017 10:49 am

Re: 2019-06-19 Wednesday day 3 session C

Unread postby Sharon Evans » Fri Jun 21, 2019 1:40 pm

Here are the shots that I have from Wednesday.
6.19.19 A member of the paint crew touches up high sided gon 1149 (1 of 1).jpg
6.19.19 A member of the paint crew touches up high sided gon 1149 (1 of 1).jpg (100.2 KiB) Viewed 3300 times

6.19.19 Overview of the repainting of box car 5553 from its RGS colour (1 of 1).jpg
6.19.19 Overview of the repainting of box car 5553 from its RGS colour (1 of 1).jpg (115.21 KiB) Viewed 3300 times

6.19.19 Another member of the paint crew keeps the paint flowing to the spriay head (1 of 1).jpg
6.19.19 Another member of the paint crew keeps the paint flowing to the spriay head (1 of 1).jpg (97.42 KiB) Viewed 3300 times

6.19.19 Crew member on the roof spraying it RGW red as support on the ground (1 of 1).jpg
6.19.19 Crew member on the roof spraying it RGW red as support on the ground (1 of 1).jpg (86.73 KiB) Viewed 3300 times

6.19.19 The roof almost done the painter backs off onto the ladder (1 of 1).jpg
6.19.19 The roof almost done the painter backs off onto the ladder (1 of 1).jpg (75.02 KiB) Viewed 3299 times

6.19.19 Two members of the crew working on the conversion of the Pbox 213 back to boxcar 3476 working on bracing (1 of 1).jpg
6.19.19 Two members of the crew working on the conversion of the Pbox 213 back to boxcar 3476 working on bracing (1 of 1).jpg (94.64 KiB) Viewed 3299 times

6.19.19 The hole drilled a bolt is inserted to tighten the baces (1 of 1).jpg
6.19.19 The hole drilled a bolt is inserted to tighten the baces (1 of 1).jpg (65.07 KiB) Viewed 3299 times

6.19.19 Two members of the team stack up lumber to be used in the conversion (1 of 1).jpg
6.19.19 Two members of the team stack up lumber to be used in the conversion (1 of 1).jpg (105.74 KiB) Viewed 3299 times

6.19.19 Applying primer to the boards to be used on the converted boxcar (1 of 1).jpg
6.19.19 Applying primer to the boards to be used on the converted boxcar (1 of 1).jpg (99.45 KiB) Viewed 3299 times

6.19.19 A new sliding side door for 5553 takes shape over by the woodshop (1 of 1).jpg
6.19.19 A new sliding side door for 5553 takes shape over by the woodshop (1 of 1).jpg (99.24 KiB) Viewed 3299 times


.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: 2019-06-19 Wednesday day 3 session C

Unread postby Sharon Evans » Fri Jun 21, 2019 5:04 pm

More from Lava pump house.
6.19.19 Looking up at the new roof joists at the Lava pump house (1 of 1).jpg
6.19.19 Looking up at the new roof joists at the Lava pump house (1 of 1).jpg (59.64 KiB) Viewed 3284 times

6.19.19 Another shot of the new roof (1 of 1).jpg
6.19.19 Another shot of the new roof (1 of 1).jpg (86.59 KiB) Viewed 3284 times

6.19.19 Outside as the new roofing itself is nailed on (1 of 1).jpg
6.19.19 Outside as the new roofing itself is nailed on (1 of 1).jpg (57.5 KiB) Viewed 3284 times

6.19.19 One of the crew using the nail gun to attach the new boards (1 of 1).jpg
6.19.19 One of the crew using the nail gun to attach the new boards (1 of 1).jpg (76.14 KiB) Viewed 3284 times


.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: 2019-06-19 Wednesday day 3 session C

Unread postby John Cole » Sat Jun 22, 2019 7:39 am

Steve says that they almost have all of the roof boards up, but they had to quit early Friday so the crew could attend the members dinner and train ride to Cumbres Pass.
John Cole
Conductor
Conductor
 
Posts: 729
Joined: Mon Nov 28, 2011 12:55 pm


Return to Work Session C (June 17-21)

Who is online

Users browsing this forum: No registered users and 3 guests