Still More From Session E

Discussion Pertaining to Work Session E - 2017

Still More From Session E

Unread postby Chris James » Mon Aug 14, 2017 11:31 am

More from E in Chama, Cumbres and Antonito
Attachments
chimney1.jpg
conterbear1.jpg
bolt car2-1.jpg
by enginehouse1.jpg
craig_sanding2.jpg
cumbres1.jpg
entrysign2.jpg
painting1.jpg
reefer1.jpg
stack1.jpg
Chris James
Editor, C&TS Dispatch
Albuquerque, NM
User avatar
Chris James
Engineer
Engineer
 
Posts: 355
Joined: Tue Nov 29, 2011 10:01 am
Location: Sandia Park, NM

Re: Still More From Session E

Unread postby Sharon Evans » Sat Aug 19, 2017 12:17 pm

Lets see how much I remember as to each of the shots above. I am working bottom to top here starting at the first post above my Emuse posts.
1. Up at Cumbres they were removing the chimney from the line inspectors shack and this is one of the workers cleaning up the removed bricks.
2. This shows Cinder Bear and its handler, Becky Falk.
3. Inside of the nut and bolt car. The Friends have this string of box cars down by the round house as storage for just about everything that they will need as well as the kitchen car and its storage car.
4. The grounds crew doing their great job of keeping the area around the station looking good.
5. Dr. McMullen using this tool to cut groves into the putty that was applied to the bunk car some time ago to seal it. Whomever did this work just plastered it right across the natural groves between boards.
6. Installing the new wiring into the sand house.
7. More work by the grounds crew. They were, in this shot, preparing the entry sign for a beautification.
8. A member of the paint crew applying the box car red to the rider gon that had work done on it. This could have been the redo of the paint job since the first time they did it, it rained hard later in the afternoon basically ruining the entire job.
9. The long reefer that the grounds crew uses for storage needed a touch up and it got done.
10. More work on the sand house to get it ready to be a functioning facility again. In this shot the crew is installing the piping from the mixing tank in the building up to the separator which will go at the top of the tower.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA


Return to Work Session E (July 24-28)

Who is online

Users browsing this forum: No registered users and 0 guests

cron