As we head into the Thanksgiving weekend, here is a short update on the Locomotive 463 project. The Antonito crews started work on the 463 back on Monday November 5th. As Marvin Casias reports; “Things went fairly well on the 463 this week. The left-side driving box grease cellars and screens have been installed. 70% of the air and steam plumbing in the cab is now finished. The air tank on the right side was installed. The #1 and #2 left side spring hanger pins were set correctly and the #1 and #2 left side driving box wear plates were installed. Overall things are coming together.”

As we receive photos and additional updates, we'll get those posted here on the Friends Forum. I would like to wish all of you and your families a very Happy Thanksgiving.
User avatar
Tim Tennant
Engineer
Engineer
 
Posts: 434
Joined: Mon Nov 21, 2011 4:04 pm

Re: Locomotive 463 Update

Unread postby Tom Casper » Wed Nov 21, 2012 6:44 pm

Thanks Tim, nice to hear work is going fwd. Happy Thanksgiving to all the Friends who read the forum!

Tom C.
Later:
tom at srclry dot com
A student of the Southend RGS!
Tom Casper
Conductor
Conductor
 
Posts: 819
Joined: Wed Jan 25, 2012 3:25 pm
Location: Southwest of the Windy City


Return to K27 #463

Who is online

Users browsing this forum: No registered users and 14 guests