Friday and wok is happening hot and heavy

Discussion Pertaining to Work Session B - 2016

Friday and wok is happening hot and heavy

Unread postby Ed Lowrance » Fri Jun 03, 2016 12:19 pm

.
Attachments
053 trucks frame assembly.jpg
RPO 053 truck frame squared up with steel corner braces
0503 protection from roof cating.jpg
Caboose 0503 is caccooned for protection during roof tar application and coupla window repairs continue
1357 outside for linseed.jpg
1357 is rolled outside for linseed application
Epoxy for caboose tully.jpg
Tully caboose end sill needed quite a bit of wood epoxy
Flat stringers .jpg
Flat 6627 receiving new nailers
Kitchen crew.jpg
The hardworking kitchen crew poses for a photo shoot
Linseed 1357 - thuss rods installed car is tight!.jpg
1357 is just about linseeded and the truss rods are tight!
Planking trex for 1357.jpg
Trex planking is pre cut to length ready for installation in Work session C. Truck frame assembly in foreground. The CRF is out of space.
REA never looked so good.jpg
The Railway Express agency never had it so good.
Squaring up 053 truck frame.jpg
Squareing up the 053 RPO trucks from is excting work.
Ed Lowrance
Fireman
Fireman
 
Posts: 103
Joined: Sat Aug 11, 2012 8:21 am

Re: Friday and wok is happening hot and heavy

Unread postby John Cole » Fri Jun 03, 2016 12:46 pm

Those ladies of the kitchen crew are responsible for about 20 to 25% MORE work getting done during work sessions. If we had to go into town to find lunch, most of us would be gone for at least 2 or so hours EACH DAY!

L to R is Linda Dueker, Mary Jane Smith, Patty Hanscom (seated), and Mary Lowes. That you ladies for all of your work and not only that, their food is GREAT!
John Cole
Conductor
Conductor
 
Posts: 729
Joined: Mon Nov 28, 2011 12:55 pm


Return to Work Session B (May 30 - June 3)

Who is online

Users browsing this forum: No registered users and 1 guest