WORK SESSION D - June 27, 2013 - Part II
Posted: Thu Jun 27, 2013 5:28 pm
by Ted Smith
More photos, folks!
- Team Leader Bob Conry and a few helpers have made good progress on the Car Inspector's House at Cumbres. This photo shows the west side of the house where a door had been cut and then covered. Whoever worked on the door cut the studs and did not use a header, so the side was bulging significantly. Bob has found that the side is actually still square, and he's framing it back in the way it was originally. Actual dimensional lumber is being used by Bob which means that the 2x4's are two inches by four inches instead of today's reduced thickness. The original studs were also 24 inches on center instead of today's 16 inches on center.