2-14-19 Track work?

Tell us what interesting thing you saw on the web-cams.

2-14-19 Track work?

Unread postby George Stoudenmire » Thu Feb 14, 2019 10:37 am

The crew is in front of #15. Looks like they are replacing rail/switch between the roundhouse and #15. Looks like a pile of ties behind #15.
George Stoudenmire
Head Brakeman
Head Brakeman
 
Posts: 82
Joined: Fri Jul 17, 2015 11:21 am
Location: Greenville, SC

Re: 2-14-19 Track work?

Unread postby Sharon Evans » Thu Feb 14, 2019 12:03 pm

you can see the pile of whatever to the left of the 15 and 315. I am wondering if they are cleaning out the back of the roundhouse since they pulled the 497 out earlier in the week.
2019-02-14 With a light snow falling, 15 has pulled 315 out of the west stall.jpg
2019-02-14 With a light snow falling, 15 has pulled 315 out of the west stall.jpg (75.74 KiB) Viewed 1525 times

2019-02-14 After a loader comes out from the stall, the 15 shoves the 315 back inside the west stall.jpg
After a loader comes out from the stall, the 15 shoves the 315 back inside the west stall

2019-02-14 Now the loader backs into the stall in front of the 315.jpg
Now the loader backs into the stall in front of the 315

2019-02-14 Once the loader is inside and clear, they close the doors.jpg
Once the loader is inside and clear, they close the doors
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA


Return to Web Cameras

Who is online

Users browsing this forum: No registered users and 161 guests