2-14-19 Track work?

Unread postPosted: Thu Feb 14, 2019 10:37 am
by George Stoudenmire
The crew is in front of #15. Looks like they are replacing rail/switch between the roundhouse and #15. Looks like a pile of ties behind #15.

Re: 2-14-19 Track work?

Unread postPosted: Thu Feb 14, 2019 12:03 pm
by Sharon Evans
you can see the pile of whatever to the left of the 15 and 315. I am wondering if they are cleaning out the back of the roundhouse since they pulled the 497 out earlier in the week.
2019-02-14 With a light snow falling, 15 has pulled 315 out of the west stall.jpg
2019-02-14 With a light snow falling, 15 has pulled 315 out of the west stall.jpg (75.74 KiB) Viewed 1529 times

2019-02-14 After a loader comes out from the stall, the 15 shoves the 315 back inside the west stall.jpg
After a loader comes out from the stall, the 15 shoves the 315 back inside the west stall

2019-02-14 Now the loader backs into the stall in front of the 315.jpg
Now the loader backs into the stall in front of the 315

2019-02-14 Once the loader is inside and clear, they close the doors.jpg
Once the loader is inside and clear, they close the doors