6/21/18 Thursday
Posted: Thu Jun 21, 2018 4:51 am
by Sharon Evans
Morning preparations:
Time for the coal bunker wash, so 488 heads back to the tank.
.
- 2018-06-21 The 488 comes out to begin its day.jpg (112.45 KiB) Viewed 2888 times
- 2018-06-21 The 488 is at the pit for the hostlers to clean the fire.jpg (99.51 KiB) Viewed 2888 times
- 2018-06-21 The 488 takes water at the tank.jpg (118.45 KiB) Viewed 2888 times
- 2018-06-21 The 488 backs toward the coal dock lead.jpg (115.88 KiB) Viewed 2887 times
- 2018-06-21 The 488 pulls by the woodshop as it heads to the coal dock.jpg (121.71 KiB) Viewed 2886 times
- 2018-06-21 Coal dust flys up as the loader dumps a bucket of coal into the tender.jpg (110 KiB) Viewed 2886 times
Time for the coal bunker wash, so 488 heads back to the tank.
- 2018-06-21 Coal wash done, the hostlers have now left the 488 for the road crew.jpg (122.56 KiB) Viewed 2886 times
- 2018-06-21 The 488 has now coupled onto the 8 car train 216.jpg (122.71 KiB) Viewed 2880 times
.