Track crew is working on removing EngineHouse leads in these captured views. Switch stand is taken down while front end loader moves rail and ties to clear. Smoke also visible out vent from time to time from loco pulled inside.
Attachments
image.jpg (162.75 KiB) Viewed 2505 times
image.jpg (169.85 KiB) Viewed 2505 times
image.jpg (168.84 KiB) Viewed 2505 times
image.jpg (165.88 KiB) Viewed 2505 times
image.jpg (173.63 KiB) Viewed 2505 times
image.jpg (170.59 KiB) Viewed 2505 times
image.jpg (168.14 KiB) Viewed 2505 times
Larry Gibson- "WYE I might HARP at you? It is only to SPUR you on!!!!!"
It looks like the track to stall 2 is up. At 4:15 the loco is sitting outside. Is there a connecting track on the backside to the yard? It has been, unfortunately, a long time since I have been able to participate in a work session and I have forgotten the track layout around the buildings. It will be interesting to watch the new track being installed.