Some 70 Friends' volunteers checked into Work Session D on Sunday and Monday, June 24-25, anxious to begin their work. While the majority of them are working on projects in Chama, nine volunteers are in Antonito, working on restoration of the frameless tank cars and also continuing to work on the car shelter.

Chama teams are focused on a wide range of projects: yard landscaping, right-of-way brush and tree control, wood preservative treatment, milepost & whistle board maintenance, sheep pen and railroad property mowing, restoration of RPO 54 and Derrick OP, repairing sheep car 5633, rebuilding gondola 9558, masonry pointing for the pumphouse walls and chimney, converting boxcar 3585 to the new tool car, cosmetically restoring engine 483 -- in addition to the support functions of food preparation, tool car operation, paint supplies, chronicling, report writing, etc.

There were lots of trips to the water coolers in 93 degree heat!

Ted and Linda
006.JPG
Ken Matzick, representing AHR, welcomes volunteers
008.JPG
Mary Jane Smith briefs volunteers on food services and volunteer dinner scheduled for Wednesday evening
012.JPG
Joyce Smalley, staffing the tool car, exchanges information with Session D Site Leader Bill Lock
013.JPG
A team of volunteers begins to cosmetically restore Engine 483
011.JPG
TL Scott Hardy (leading the sheep car repairs team) registers with Judy Lock
018.JPG
Chama depot sign was repainted in Session C by the Milepost & Whistle Board Maintenance Team; the sign could hardly be read before it was repainted!
019.JPG
Laurel Hoppes works on landscaping the Chama yard, planting flowers in new boxes constructed during Session C by Larry and Phil McDonald
021.JPG
Bob Hawkins and Wayne Huddleston have reinstalled the "Baggage" sign on the Chama Depot; it was partially painted, along with the "Freight sign, in Session C
016.JPG
Original pipe flanges that connected to the donkey steam engine on Derrick OP were cast iron; it was decided to upgrade, and TL Russ Hanscom machined and welded the four new flanges shown here. Welding high pressure steam fittings definitely separates the "men from the boy" welders!
Attachments
001.JPG
RPO 054 restoration progress - first piece of fascia has been installed on the exterior!
Last edited by Ted Smith on Mon Jun 25, 2012 7:48 pm, edited 3 times in total.
Ted Smith
Head Brakeman
Head Brakeman
 
Posts: 99
Joined: Mon Nov 28, 2011 11:46 pm

Re: WORK SESSION D - FIRST DAY

Unread postby John Cole » Mon Jun 25, 2012 7:37 pm

That looks like schedule 80 pipe in the last photo. That is some seriously thick pipe that will withstand lots of pressure, but takes some high amperage to weld. I am sure Russ is up to the job having worked on oil well platforms.