Unread postby Sharon Evans » Mon Jul 27, 2020 9:28 am

The last thread has gotten too long so will post the final pictures for the week here.
We begin the post for Friday with more from caboose 5635.
c Some of the new electric switches inside of 5635 (1 of 1).jpg
Some of the new electric switches inside of 5635

c Another shot of the switches showing the cabnet they are in (1 of 1).jpg
Another shot of the switches showing the cabinet they are in

c The label speakes for itself (1 of 1).jpg
The label speaks for itself

c The finish coat of caboose red is being applied to this window (1 of 1).jpg
The finish coat of caboose red is being applied to this window

c Painting is going on all over the 5635 (1 of 1).jpg
Painting is going on all over the 5635

c Another window on 5635 gets painted (1 of 1).jpg
Another window on 5635 gets painted

c The capola gets the paint treatment (1 of 1).jpg
The cupola gets the paint treatment

c An overall shot of 5635 showing the finish coat applied (1 of 1).jpg
A shot of the repainted 5635 from the A end

c A view of the B end of the 5635 (1 of 1).jpg
A view of the B end of the 5635

c A view of the finished, for now, painting from the side (1 of 1).jpg
A view of the finished, for now, painting from the side

c And the final side is show (1 of 1).jpg
And the final side is show

c One last shot of 5635 (1 of 1).jpg
One last shot of 5635

The final shots from outside the CRF
A stack of boards which have be planed so they fit together (1 of 1).jpg
A stack of boards which have be planed so they fit together

Some very large boards that have been delivered to the CRF (1 of 1).jpg
Some very large boards that have been delivered to the CRF

More truck parts by the wheel press (1 of 1).jpg
More truck parts by the wheel press

The two trucks that were built this session wait to be placed (1 of 1).jpg
The two trucks that were built this session wait to be placed

The loader is dumping dirt to help with the cleanup (1 of 1).jpg
The loader is dumping dirt to help with the cleanup

Grading that has been done outside the CRF (1 of 1).jpg
Grading that has been done outside the CRF

Another shot of the grading, I think this will be a new walkway (1 of 1).jpg
Another shot of the grading, I think this will be a new walkway


That is all that I have for session E. If I should get further pictures, they will be posted, otherwise we wait for the beginning of session F1 in August.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Return to All 2020 Work Sessions Combined

Who is online

Users browsing this forum: No registered users and 1 guest