Page 1 of 1

More from the Special Session

Unread postPosted: Sat Aug 31, 2019 9:24 am
by Sharon Evans
Pat Maufrais has sent me additional photographs from the OY special session.
2019.08.24 Installing the wooden cover over the OY tender bunker (1 of 1).jpg
2019.08.24 Installing the wooden cover over the OY tender bunker (1 of 1).jpg (51.05 KiB) Viewed 1324 times

2019.08.24 In this shot the hinges on the OY tender bunker cover are evident (1 of 1).jpg
2019.08.24 In this shot the hinges on the OY tender bunker cover are evident (1 of 1).jpg (88.8 KiB) Viewed 1324 times

2019.08.24 A nice shot of the OY tender with the new coal bunker cover in place (1 of 1).jpg
2019.08.24 A nice shot of the OY tender with the new coal bunker cover in place (1 of 1).jpg (80.21 KiB) Viewed 1324 times

2019.08.24 New and painted batten boards in the front of the OY tender (1 of 1).jpg
2019.08.24 New and painted batten boards in the front of the OY tender (1 of 1).jpg (59.42 KiB) Viewed 1324 times

2019.08.24 Sanding on the OY tender to get it ready for painting (1 of 1).jpg
2019.08.24 Sanding on the OY tender to get it ready for painting (1 of 1).jpg (80.9 KiB) Viewed 1324 times

2019.08.24 The steps have been cleaned up and wood filler applied where needed (1 of 1).jpg
2019.08.24 The steps have been cleaned up and wood filler applied where needed (1 of 1).jpg (91.51 KiB) Viewed 1324 times

2019.08.24 Repair work is ongoing on the steps up to the firebox of OY (1 of 1).jpg
2019.08.24 Repair work is ongoing on the steps up to the firebox of OY (1 of 1).jpg (77.89 KiB) Viewed 1324 times

2019.08.24 Removing old paint from the end sill beam of the OY tender (1 of 1).jpg
2019.08.24 Removing old paint from the end sill beam of the OY tender (1 of 1).jpg (103.38 KiB) Viewed 1324 times

2019.08.24 Two members are on the man lift working on the roof of the OY (1 of 1).jpg
2019.08.24 Two members are on the man lift working on the roof of the OY (1 of 1).jpg (86.56 KiB) Viewed 1324 times

2019.08.24 Using a fine tool, a crowbar, to get the old roof material off the OY (1 of 1).jpg
2019.08.24 Using a fine tool, a crowbar, to get the old roof material off the OY (1 of 1).jpg (72.33 KiB) Viewed 1324 times

2019.08.24 Inside the CRS using the woodworking tools to get new boards ready for OY (1 of 1).jpg
2019.08.24 Inside the CRS using the woodworking tools to get new boards ready for OY (1 of 1).jpg (120.86 KiB) Viewed 1324 times

2019.08.24 Tracing the outline of a roof support from OY onto new wood (1 of 1).jpg
2019.08.24 Tracing the outline of a roof support from OY onto new wood (1 of 1).jpg (124.48 KiB) Viewed 1324 times

2019.08.24 Plaining out a new roof support for the OY (1 of 1).jpg
2019.08.24 Plaining out a new roof support for the OY (1 of 1).jpg (108.5 KiB) Viewed 1324 times

2019.08.24 Roof work on the OY progresses at the business end (1 of 1).jpg
2019.08.24 Roof work on the OY progresses at the business end (1 of 1).jpg (89.9 KiB) Viewed 1324 times

2019.08.24 Nice shot of them installing these new roof supports (1 of 1).jpg
2019.08.24 Nice shot of them installing these new roof supports (1 of 1).jpg (69.76 KiB) Viewed 1324 times

2019.08.24 The new roof on OY is almost done by the looks of it (1 of 1).jpg
2019.08.24 The new roof on OY is almost done by the looks of it (1 of 1).jpg (70.29 KiB) Viewed 1324 times

2019.08.24 Measuring the old part with the new one behind (1 of 1).jpg
2019.08.24 Measuring the old part with the new one behind (1 of 1).jpg (100.11 KiB) Viewed 1324 times

2019.08.24 Mounting the hardware onto the new sliding side door of OY (1 of 1).jpg
2019.08.24 Mounting the hardware onto the new sliding side door of OY (1 of 1).jpg (102.94 KiB) Viewed 1324 times

2019.08.24 Putting what I think is primer on a piece of OY before it is installed (1 of 1).jpg
2019.08.24 Putting what I think is primer on a piece of OY before it is installed (1 of 1).jpg (99.6 KiB) Viewed 1324 times
.