Page 1 of 1

Special session 2 at Antonito for OY work

Unread postPosted: Mon Aug 26, 2019 7:12 am
by Sharon Evans
Even though its the off period between scheduled work sessions the work on rotary OY continues.
2019.08.25 Working on new window frames forthe OY (1 of 1).jpg
2019.08.25 Working on new window frames forthe OY (1 of 1).jpg (115.69 KiB) Viewed 1479 times

2019.08.25 Painting the new window frames so the can be installed (1 of 1).jpg
2019.08.25 Painting the new window frames so the can be installed (1 of 1).jpg (97.16 KiB) Viewed 1479 times

2019.08.25 Sitting on top of the OY's tender (1 of 1).jpg
2019.08.25 Sitting on top of the OY's tender (1 of 1).jpg (91.58 KiB) Viewed 1479 times

2019.08.25 nailing down foofing boards on teh OY (1 of 1).jpg
2019.08.25 nailing down foofing boards on teh OY (1 of 1).jpg (93.18 KiB) Viewed 1479 times

2019.08.25 Installing the seperator board between the tender and fire box od OY (1 of 1).jpg
2019.08.25 Installing the seperator board between the tender and fire box od OY (1 of 1).jpg (77.08 KiB) Viewed 1479 times

.