Work done on box car 3476

Discussion Pertaining to Work Session F - 2019

Work done on box car 3476

Unread postby Sharon Evans » Wed Sep 18, 2019 10:35 am

Pat has sent the photos he did for the week on this car.
2019.07.31 Ovall view of box car 3476 which is the conversion from the old Pbox (1 of 1).jpg
Overall view of box car 3476 which is the conversion from the old Pbox

2019.07.31 using every bit of leverage to get that bolt tight (1 of 1).jpg
Using every bit of leverage to get that bolt tight

2019.07.31 Installing the grab irons on the car end as well as other work going on (1 of 1).jpg
Installing the grab irons on the car end as well as other work going on

2019.07.31 Installing the hand brake assembly on the car (1 of 1).jpg
Installing the hand brake assembly on the car

2019.07.31 Installing the hardware for the end door (1 of 1).jpg
Installing the hardware for the end door

2019.07.31 Getting the roof walk set (1 of 1).jpg
Getting the roof walk set

2019.07.31 Flattening down the bot heads so the nuts will not come loose (1 of 1).jpg
Flattening down the bolt heads so the nuts will not come loose

2019.07.31 The door has been hung on one side of the car (1 of 1).jpg
The door has been hung on one side of the car

2019.07.31 The other side is done now (1 of 1).jpg
The other side is done now

2019.07.31 Hoisting up the end roof platform (1 of 1).jpg
Hoisting up the end roof platform

2019.07.31 The finished car now is in primer (1 of 1).jpg
The finished car now is in primer

2019.07.31 The paint crew has now done the car and it awaits lettering (1 of 1).jpg
The paint crew has now done the car and it awaits lettering




.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Return to Work Session F (Aug 5-9)

Who is online

Users browsing this forum: No registered users and 8 guests

cron