2019-05-31 Friday day 5

Unread postPosted: Fri May 31, 2019 12:49 pm
by Sharon Evans
Friday, last day of Session B in Antonito:
The pad looks ready for the pour.jpg
The pad looks ready for the pour

Looks like they have glied a strip of wood onto this beam.jpg
Looks like they have glied a strip of wood onto this beam

Another passenger car truck is taking shape.jpg
Another passenger car truck is taking shape

A length of pipe is getting threads cut into it.jpg
A length of pipe is getting threads cut into it

Working of the valve maybe for the brakes of a car.jpg
Working of the valve maybe for the brakes of a car

Looks like they are working on the hand brake for the caboose.jpg
Looks like they are working on the hand brake for the caboose




.

Re: 2019-05-31 Friday day 5

Unread postPosted: Mon Jun 03, 2019 9:30 am
by Craig Kumler
Thanks Sharon for the Pics!

Re: 2019-05-31 Friday day 5

Unread postPosted: Mon Jun 03, 2019 2:17 pm
by Sharon Evans
:smiley24:

Re: 2019-05-31 Friday day 5

Unread postPosted: Wed Jun 12, 2019 12:11 pm
by Ian Kelly
2nd picture down - the masonite is being used as a template for a reworking of the equalizer bars for the 470 trucks.
Ian

Re: 2019-05-31 Friday day 5

Unread postPosted: Thu Jun 13, 2019 8:28 am
by Robert Brigham
The 5th picture down is the isolation valve for the air brake system on flatcar 6214. After upgrading the air lines from schedule 40 to schedule 80, a system check revealed the only major leak was this valve. We were struggling to take it apart (for the first time in 90 years?) so we could repair the leak.
We were not successful and will have to complete this repair in work week G.

Re: 2019-05-31 Friday day 5

Unread postPosted: Thu Jun 13, 2019 2:03 pm
by Sharon Evans
Thanks for all the input on the activities.