2019-05-31 Friday day 5

Discussion Pertaining to Work Session B - 2019

2019-05-31 Friday day 5

Unread postby Sharon Evans » Fri May 31, 2019 12:49 pm

Friday, last day of Session B in Antonito:
The pad looks ready for the pour.jpg
The pad looks ready for the pour

Looks like they have glied a strip of wood onto this beam.jpg
Looks like they have glied a strip of wood onto this beam

Another passenger car truck is taking shape.jpg
Another passenger car truck is taking shape

A length of pipe is getting threads cut into it.jpg
A length of pipe is getting threads cut into it

Working of the valve maybe for the brakes of a car.jpg
Working of the valve maybe for the brakes of a car

Looks like they are working on the hand brake for the caboose.jpg
Looks like they are working on the hand brake for the caboose




.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: 2019-05-31 Friday day 5

Unread postby Craig Kumler » Mon Jun 03, 2019 9:30 am

Thanks Sharon for the Pics!
Craig Kumler
Engineer
Engineer
 
Posts: 394
Joined: Mon Nov 28, 2011 4:24 pm
Location: San Jose, Ca.

Re: 2019-05-31 Friday day 5

Unread postby Sharon Evans » Mon Jun 03, 2019 2:17 pm

:smiley24:
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: 2019-05-31 Friday day 5

Unread postby Ian Kelly » Wed Jun 12, 2019 12:11 pm

2nd picture down - the masonite is being used as a template for a reworking of the equalizer bars for the 470 trucks.
Ian
Ian Kelly
Brakeman
Brakeman
 
Posts: 36
Joined: Fri Aug 28, 2015 7:56 am

Re: 2019-05-31 Friday day 5

Unread postby Robert Brigham » Thu Jun 13, 2019 8:28 am

The 5th picture down is the isolation valve for the air brake system on flatcar 6214. After upgrading the air lines from schedule 40 to schedule 80, a system check revealed the only major leak was this valve. We were struggling to take it apart (for the first time in 90 years?) so we could repair the leak.
We were not successful and will have to complete this repair in work week G.
Robert Brigham
Head Brakeman
Head Brakeman
 
Posts: 85
Joined: Thu Jun 02, 2016 6:31 pm
Location: Escondido, CA

Re: 2019-05-31 Friday day 5

Unread postby Sharon Evans » Thu Jun 13, 2019 2:03 pm

Thanks for all the input on the activities.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA


Return to Work Session B (May 27-31)

Who is online

Users browsing this forum: No registered users and 6 guests