Tuesday 6/26/18

Discussion Pertaining to Work Session D - 2018

Tuesday 6/26/18

Unread postby Sharon Evans » Tue Jun 26, 2018 7:35 pm

Photos from today.
2018-06-26 More work on tearing down the high sided gon in the swamp.jpg
More work on tearing down the high sided gon in the swamp

2018-06-26 It looks like a mess now, but when done it will be a new car.jpg
It looks like a mess now, but when done it will be a new car

2018-06-26 Here we see the high sided gon being riped apart next to the flat car which is coming back together.jpg
Here we see the high sided gon being ripped apart next to the flat car which is coming back together

2018-06-26 Its hard work scraping off all the old paint.jpg
Its hard work scraping off all the old paint

2018-06-26 More prep work to get the Friends cars repainted and looking nice.jpg
More prep work to get the Friends cars repainted and looking nice

2018-06-26 With the end of an already completed car covered, the paint crew starts spriaying box car red on the preped car.jpg
With the end of an already completed car covered, the paint crew starts spraying box car red on the prepped car

2018-06-26 We can really see the paint coming out of that spray nozzle.jpg
We can really see the paint coming out of that spray nozzle

2018-06-26 The brush crew continues to work along the line just outside of Chama.jpg
The brush crew continues to work along the line just outside of Chama


.
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: Tuesday 6/26/18

Unread postby Sharon Evans » Tue Jun 26, 2018 7:54 pm

Up at Cumbres:
2018-06-26 Up at Cumbres, the framing of the car inspectors house is coming right along.jpg
Up at Cumbres, the framing of the car inspectors house is coming right along

2018-06-26 The siding is going up at Cumbres.jpg
The siding is going up at Cumbres
Sharon Evans
Conductor
Conductor
 
Posts: 4904
Joined: Tue Oct 21, 2014 2:54 pm
Location: Glen Allen, VA

Re: Tuesday 6/26/18

Unread postby Chris James » Tue Jun 26, 2018 9:17 pm

The Drop Bottom Gon is ready to move into the CRF:
DBG_in CRF.jpg
Chris James
Editor, C&TS Dispatch
Albuquerque, NM
User avatar
Chris James
Engineer
Engineer
 
Posts: 355
Joined: Tue Nov 29, 2011 10:01 am
Location: Sandia Park, NM

Re: Tuesday 6/26/18

Unread postby Pete Dahlberg » Wed Jun 27, 2018 8:29 pm

Quick correction on the Cumbres work, the boards going in are sheathing which will be covered with roofing felt and then the actual siding. BTW we completed the siding Wednesday afternoon and it will be primed on Thursday and final painted on Friday.
Pete Dahlberg
Engineer
Engineer
 
Posts: 479
Joined: Tue Aug 18, 2015 1:53 pm
Location: Arlington TX

Re: Tuesday 6/26/18

Unread postby Chris James » Thu Jun 28, 2018 7:49 am

Thanks for the correction, Pete. show ya what I know...
Chris James
Editor, C&TS Dispatch
Albuquerque, NM
User avatar
Chris James
Engineer
Engineer
 
Posts: 355
Joined: Tue Nov 29, 2011 10:01 am
Location: Sandia Park, NM

Re: Tuesday 6/26/18

Unread postby Pete Dahlberg » Thu Jun 28, 2018 3:05 pm

Actually what Bob Conry has been drilling into our heads
Pete Dahlberg
Engineer
Engineer
 
Posts: 479
Joined: Tue Aug 18, 2015 1:53 pm
Location: Arlington TX


Return to Work Session D (June 25-29)

Who is online

Users browsing this forum: No registered users and 3 guests