Sharon's Uncommonly good Chama adventure 1
Posted: Fri Jul 22, 2016 9:28 pm
I arrived in Chama at 2:15 this afternoon and wasted no time in getting up the hill to chase 215 back. I was able to first catch it at Los Pinos valley and follow it back to Chama. Here is a sampling of today's images. Just noted that I need to update my watermark.
Train 215 comes up the Los Pinos valley
Working upgrade between Los Pinos and Tanglefoot Curve
Almost at the summit, 487 blows for 4th crossing
215 comes very slowly around Windy Point
487 brings the train over 3d crossing also know as Coxo crossing
coming over 2d crossing the engineer is laying on the whistle
Coming over Labato trestle
As 215 enters Chama yard we see it passing the water tower
You get a good look at the bunting on the platform of parlor Colorado which has been there since opening day. That is conductor Chris hanging off the step of the parlor.
Train 215 comes up the Los Pinos valley
Working upgrade between Los Pinos and Tanglefoot Curve
Almost at the summit, 487 blows for 4th crossing
215 comes very slowly around Windy Point
487 brings the train over 3d crossing also know as Coxo crossing
coming over 2d crossing the engineer is laying on the whistle
Coming over Labato trestle
As 215 enters Chama yard we see it passing the water tower
You get a good look at the bunting on the platform of parlor Colorado which has been there since opening day. That is conductor Chris hanging off the step of the parlor.