There was some prep work done on the CRF before G session.

Valley is giving the skid resistant concrete floor a painting.
DSCN1757.JPG


And Ed is dressed up as Darth Vader preparing things
DSCN1755 (1).JPG


Thank you Ed and Valley for the photos
Joe Kanocz
Moderator
Moderator
 
Posts: 580
Joined: Thu Nov 17, 2011 5:06 pm

Re: Pre G prep work

Unread postby John Cole » Mon Sep 29, 2014 7:41 pm

That's ALOT of work on a 60X72 foot building. I assume they are coating the floors in sections? Why I remember when all we had in that building was DIRT floors and NO tracks, how far we have come. :-)

BTW, Ed was the guy who supervised the construction of the CRF back in 03, he did a great job, we LOVE that building!
John Cole
Conductor
Conductor
 
Posts: 729
Joined: Mon Nov 28, 2011 12:55 pm

Re: Pre G prep work

Unread postby Rich Murray » Tue Sep 30, 2014 6:10 am

In the photo with Valley is DBG 783. The progress on it is considerable. Good to see!
User avatar
Rich Murray
Moderator
Moderator
 
Posts: 1048
Joined: Thu Nov 17, 2011 3:30 pm


Return to Work Session G (September 29 - Ocotber 3)

Who is online

Users browsing this forum: No registered users and 8 guests

cron