Pre G prep work

Unread postPosted: Mon Sep 29, 2014 6:53 pm
by Joe Kanocz
There was some prep work done on the CRF before G session.

Valley is giving the skid resistant concrete floor a painting.
DSCN1757.JPG


And Ed is dressed up as Darth Vader preparing things
DSCN1755 (1).JPG


Thank you Ed and Valley for the photos

Re: Pre G prep work

Unread postPosted: Mon Sep 29, 2014 7:41 pm
by John Cole
That's ALOT of work on a 60X72 foot building. I assume they are coating the floors in sections? Why I remember when all we had in that building was DIRT floors and NO tracks, how far we have come. :-)

BTW, Ed was the guy who supervised the construction of the CRF back in 03, he did a great job, we LOVE that building!

Re: Pre G prep work

Unread postPosted: Tue Sep 30, 2014 6:10 am
by Rich Murray
In the photo with Valley is DBG 783. The progress on it is considerable. Good to see!