Pre G prep work
Posted: Mon Sep 29, 2014 6:53 pm
There was some prep work done on the CRF before G session.
Valley is giving the skid resistant concrete floor a painting.
And Ed is dressed up as Darth Vader preparing things
Thank you Ed and Valley for the photos
Valley is giving the skid resistant concrete floor a painting.
And Ed is dressed up as Darth Vader preparing things
Thank you Ed and Valley for the photos