Unread postby Joe Kanocz » Tue Aug 19, 2014 1:32 pm

Bob and Ron are still working on the Cumbres section house. They're doing some foundation and siding work before winter sets in.

20140819_134336.jpg

20140819_134217.jpg
Joe Kanocz
Moderator
Moderator
 
Posts: 580
Joined: Thu Nov 17, 2011 5:06 pm

Re: Some post F session work

Unread postby Craig Kumler » Tue Aug 19, 2014 3:20 pm

Looks great Joe...good to see work still happening.
Craig Kumler
Engineer
Engineer
 
Posts: 394
Joined: Mon Nov 28, 2011 4:24 pm
Location: San Jose, Ca.

Re: Some post F session work

Unread postby Joe Kanocz » Tue Aug 19, 2014 3:49 pm

Bob is doing some excellent work on the section house. Instead of just putting a fix on things, he's correcting major issues.
Joe Kanocz
Moderator
Moderator
 
Posts: 580
Joined: Thu Nov 17, 2011 5:06 pm

Re: Some post F session work

Unread postby John Cole » Tue Aug 19, 2014 9:46 pm

Bob is the guy to do it too. He did shoring of buildings and structures before he retired, and he was one of John Sutkus's main guys on repairing and installing that concrete grade beam on the coal tipple that made it possible to start jacking the building back into plumb over a period of years. Good job! :smiley24:
John Cole
Conductor
Conductor
 
Posts: 729
Joined: Mon Nov 28, 2011 12:55 pm


Return to Work Session F (August 4 - 8)

Who is online

Users browsing this forum: No registered users and 1 guest